Renovation of a clubhouse / community center in Fort Worth, Texas. Completed plans call for the renovation of a clubhouse / community center.

The City will select the CMAR Contractor by using a two-step Request for Proposal (RFP) process. After evaluating the submitted Proposals from the CMAR Offerors, the City will shortlist and interview up to three Offerors. The City will then select and enter into negotiations with the Best Value Offeror. The City may discuss with the selected Offeror, options for a scope or time modification and any price change associated with such modification. The selected CMAR Contractor will provide Pre-Construction Services including Constructability Reviews, Value Engineering Recommendations and Estimating Services Fees to review during the various phases of the design process. Once the construction documents are completed, the selected CMAR Contractor will provide a Guaranteed Maximum Price (GMP) and construction performance period for each of the three major portions of the work and all work combined. This GMP will be inclusive of Value Engineering and Estimating Services fees, General Conditions, Construction Manager's Fee, contingency, bonds, insurance, and other agreed upon costs; plus the City's General Contingency Allowance. The total construction cost is anticipated to be approximately $9,000,000.00, refer to the "Project Proposal Form" found in the Instructions to Construction Manager-At-Risk (CMAR) Offerors The City of Fort Worth will negotiate a Pre-Construction Services Contract and later negotiate a Construction Services Contract with the selected CMAR firm determined to have made the Best Value offer. Refer to the "Project Proposal Form". Refer to the Request for Proposal documents for the Business Equity Ordinance Information. MWBE participation will be evaluated in awarding this contract. The MWBE participation goal is 20% for the estimated construction budgets. The goal will be applied to the GMPs (and fees) when the GMP agreements are reached. Offerors must submit an anticipated MWBE Utilization Plan with their CMAR Proposal submittal. The submitted Plan will be part of the weighted selection criteria. Refer to Instructions to Construction Manager-at-Risk (CMAR) Offerors for additional information. Contact the MW/BE Office at (817) 212-2674 to obtain a list of certified subcontractors and suppliers. The selected CMAR Contractor will be required to provide Payment and Performance Bonds and provide Contractors General Liability and Statutory Workers Compensation Coverage once the GMP is agreed upon. The last day for questions from prospective Offerors is at 5:00 PM on Friday, October 15, 2021. Contact the Project Manager, Ronnie Clements, at (817) 392-8014 or email Ronald.Clements@fortworthtexas.gov or Project Architect, Stephen Springs at (972) 960-9970 or email SSprings@bsw-architects.com for assistance. The MWBE participation goal is 20% for the estimated construction budgets.

Award

Clubhouse / Community Centers

$9,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
205
Bidding Soon
4,946
All Active Projects
1,960
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 21, 2021

August 8, 2022

img_map_placeholder

8375 Blue Mound Rd, Fort Worth, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.