Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a clubhouse / community center in Fort Worth, Texas. Completed plans call for the renovation of a clubhouse / community center.
The City will select the CMAR Contractor by using a two-step Request for Proposal (RFP) process. After evaluating the submitted Proposals from the CMAR Offerors, the City will shortlist and interview up to three Offerors. The City will then select and enter into negotiations with the Best Value Offeror. The City may discuss with the selected Offeror, options for a scope or time modification and any price change associated with such modification. The selected CMAR Contractor will provide Pre-Construction Services including Constructability Reviews, Value Engineering Recommendations and Estimating Services Fees to review during the various phases of the design process. Once the construction documents are completed, the selected CMAR Contractor will provide a Guaranteed Maximum Price (GMP) and construction performance period for each of the three major portions of the work and all work combined. This GMP will be inclusive of Value Engineering and Estimating Services fees, General Conditions, Construction Manager's Fee, contingency, bonds, insurance, and other agreed upon costs; plus the City's General Contingency Allowance. The total construction cost is anticipated to be approximately $9,000,000.00, refer to the "Project Proposal Form" found in the Instructions to Construction Manager-At-Risk (CMAR) Offerors The City of Fort Worth will negotiate a Pre-Construction Services Contract and later negotiate a Construction Services Contract with the selected CMAR firm determined to have made the Best Value offer. Refer to the "Project Proposal Form". Refer to the Request for Proposal documents for the Business Equity Ordinance Information. MWBE participation will be evaluated in awarding this contract. The MWBE participation goal is 20% for the estimated construction budgets. The goal will be applied to the GMPs (and fees) when the GMP agreements are reached. Offerors must submit an anticipated MWBE Utilization Plan with their CMAR Proposal submittal. The submitted Plan will be part of the weighted selection criteria. Refer to Instructions to Construction Manager-at-Risk (CMAR) Offerors for additional information. Contact the MW/BE Office at (817) 212-2674 to obtain a list of certified subcontractors and suppliers. The selected CMAR Contractor will be required to provide Payment and Performance Bonds and provide Contractors General Liability and Statutory Workers Compensation Coverage once the GMP is agreed upon. The last day for questions from prospective Offerors is at 5:00 PM on Friday, October 15, 2021. Contact the Project Manager, Ronnie Clements, at (817) 392-8014 or email Ronald.Clements@fortworthtexas.gov or Project Architect, Stephen Springs at (972) 960-9970 or email SSprings@bsw-architects.com for assistance. The MWBE participation goal is 20% for the estimated construction budgets.
Award
Clubhouse / Community Centers
$9,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2021
August 8, 2022
8375 Blue Mound Rd, Fort Worth, TX
Related To This Project
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Jun 07 2022
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Apr 28 2022
Fort Worth, TX
Bid Date: Jun 23 2022
Fort Worth, TX
Bid Date: Jun 23 2022
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Jun 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.