BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2024 at 7:00 PM

Updated January 27, 2024

Site work, paving and new construction of a bridge / tunnel in Chatham, New Hampshire. Design plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of January 8, 2024, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Engineering firms are invited to submit a Statement of Qualifications to design and develop site-specific, engineered plans to replace abutments on two existing snowmobile bridges on the snowmobile trail known as "Corridor 19" (on McDonough Brook Rd/Country Rd.) also known as Nation Forest Service Road 244 in Chatham NH within the White Mountain National Forest (WMNF). Contract award: 4/13/2022 Anticipated project start date 7/1/2022 Anticipated project start date 7/1/2022 Project design completion date 12/30/2022 Construction commence 5/5/2023 Construction Complete 12/30/2023 All inquiries concerning this RFQ, including but not limited to, requests for clarifications, questions, and any changes to the RFQ, shall be submitted via email to the following RFQ designated Point of Contact: TO: Alexis Rudko, Bureau of Trails Tel: 603-271-3594 E-mail: alexis.m.rudko@dncr.nh.gov The method of contractor selection has not been determined at this time.

Design

Bridges / Tunnels

$600,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
53
Bidding Soon
801
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

Project location map

McDonough Brook Road, Chatham, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.