BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of an educational facility in Appleton, Wisconsin. Working plans call for the remodel of a educational facility.

As of 01/03/2022 This project has been rejected due to current budgetary constraints. Project number- 15040-03 To create a Center for Innovative Learning (CIL) to be located within the D.J. Bordini Center. The remodel will consist of combining three (3) current classrooms into one large open space. The project will include: removing walls, constructing new walls, installing storefront glazing, casework and flooring. The remodel will also require ceiling work, painting, HVAC and electrical work. The project will be awarded to one (1) general contractor. Please contact Amy M. at 920-993-5127 or purchasing@fvtc.edu with any questions The remodel will consist of combining (3) current classrooms into one large open space. The project will include: removing walls, constructing new walls, installing storefront glazing, casework and flooring. The remodel will also require ceiling work, painting, HVAC and electrical work. The project will be awarded to one (1) general contractor. Fox Valley Technical College is a public 2-year Technical College with its main campus and headquarters located in Appleton, Wisconsin and a student body of over 6,500 FTE (full time equivalent) students. It serves approximately 47,000 people annually. FVTC has two campuses (Appleton and Oshkosh), four regional centers (Chilton, Clintonville, Waupaca, and Wautoma) and eight training centers (four in Appleton, three in Oshkosh, and one in Gambrills, MD) covering a 5-county area (Calumet, Outagamie, Waupaca, Waushara, and Winnebago) and parts of 4 other counties (Brown, Manitowoc, Portage, and Shawano) A. Provide all labor, supervision, materials, tools and equipment to complete project as described in the Scope of Work. B. Contractor is responsible for complying with all Federal, State, and Local regulations, codes and to obtain all permits required to perform this work. C. Contractor is responsible for coordinating all rough-in and final inspections needed. D. Unless stated otherwise, Contractor shall comply with FVTC Construction Specification Standards ("FVTC Standards"). E. Contractor is responsible for final clean of construction and adjacent areas. F. Prior to the installation of any new or removed ceiling tile, the Contractor shall provide FVTC Facilities staff the opportunity to perform an above ceiling inspection. G. Where existing flooring is to remain, Contractor is responsible for protecting it from damage during the work. H. Contractor is responsible for verifying all dimensions.

Final Planning

Educational

$550,000.00

Public - State/Provincial

Remodeling

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
31
Bidding Soon
373
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

July 4, 2022

img_map_placeholder

5 N Systems Dr, Appleton, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.