BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2022 at 7:00 PM

Updated November 13, 2025

Site work and paving for a mixed-use development in Tifton, Georgia. Completed plans call for site work for a playground / park / athletic field; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Abraham Baldwin Agricultural College is seeking Sealed Bids for the construction of the South Parking Lot Improvements located on the ABAC campus in Tifton, Georgia Work to Be Done: The work to be done shall consist of furnishing all labor, materials, and equipment necessary to construct the proposed South Parking Area Improvements as shown on the construction drawings. In general, construction consists of minor clearing and grubbing; demolition of existing basketball courts, curbing; asphalt leveling, milling; new base and pavement, drainage pipe and structures; concrete islands; traffic striping, and other miscellaneous items required as part of the scheduled improvements.. This work will be awarded in one (1) contract with a 180 consecutive calendar day construction schedule. This project will require a phased construction schedule due to class scheduling. Contractor License: Any Contractor submitting a bid must be a pre-qualified Georgia Department of Transportation Contractor. License numbers must be written on the face of the bid envelope. No bid will be opened unless the license number is clearly shown. See Instructions to Bidders for additional bidding requirements. Prospective Bidders may examine the Bidding Documents at the Abraham Baldwin Agricultural College, Herring Hall Conference Room 2nd floor, 2802 Moore Hwy, ABAC 11, Tifton, GA 31793 or at Watkins & Associates, LLC on Mondays through Fridays between the hours of 8 A.M. and 5 P.M. The date that the Bidding Documents are transmitted will be considered the prospective Bidder's date of receipt of the Bidding Documents. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Office of the Engineer. Bonds: All bid forms must be accompanied by a Bid Bond in an amount not less than ten percent (10%) of the amount bid. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing All Questions regarding bid specifications and plans please direct to Watkins & Associates, LLC Phone: (229) 388-8823, (Office of the Engineer) No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. The Owner, reserves the right to reject any or all bids, to waive informalities, and to re-advertise.

Post-Bid

Sidewalks / Parking Lot

Public - State/Provincial

Paving, Site Work

28

16

15

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
58
Bidding Soon
641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2021

December 17, 2021

Project location map

2802 Moore Hwy, Tifton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.