Published January 31, 2022 at 7:00 PM

Updated June 12, 2025

Site work and new construction of a power facility in Danvers, Massachusetts. Completed plans call for the construction of a power facility; and for site work for a power facility.

New Substation Control House and Removal of the Existing One Owner's Project Manager to assist with the design and construction of a new substation control house and removal of the existing one. The estimated total project cost may range from $2,700,000.00 to $2,800,000.00 The anticipated execution of the OPM Contract is 1/31/22. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The OPM will report to the Town of Danvers, Electric Division, Systems Engineer -James Gomes. The duties of the OPM shall include, but need not be limited to, providing advice and consultation with respect to design, value engineering, scope of the work, cost estimating, budget monitoring, general contractor, and subcontractor prequalification pursuant to M.G.L. c. 7C, ss 44-57 and M.G.L. c. 149 section 44D 1/2 or 44D 3/4 . When applicable, scheduling, construction and the selection, negotiation with and oversight of a designer and a general contractor for the project, ensuring the preparation of time schedules which shall serve as control standards for monitoring performance of the building project, and assisting in project evaluation including, but not limited to, written evaluation of the performance of the design professional, contractors, and subcontractors. The Owner's Project Manager shall maintain a complete Project file including, but not necessarily limited to, a copy of the executed agreements of the Owner-Owner's Project Manager, Owner-Architect and the Owner-Contractor, including copies of performance and payment bonds, a master list of permits, certificates of insurance, licenses and approvals for the Project, correspondence, daily reports, payment records, shop drawings, submittals, project schedules, requests for information, change orders/amendments, change directives and meeting minutes. The Owner's Project Manager shall assist the Owner in responding to any public records request received by the Owner.

Post-Bid

Power Plant

$2,800,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
540
Active Projects
304
Bidding Soon
3,903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2022

April 12, 2022

Project location map

Multiple Locations, Danvers, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.