Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Cypress, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The work primarily consists of blasting, repairing pitted areas, repairing other holes found, and applying an NSF approved protective coating system per specifications in the interior of the existing 429,000-gallon ground storage tank located at Harris Counties Municipal Utility District No. 70's water plant on 7518 Connemara Dr. Additionally, a 16" valve must be replaced The above-described construction will be performed in accordance with plans and specifications and any addenda thereto which may be issued prior to forty-eight (48) hours before the opening of bids. Prospective bidders may obtain drawings, specifications and bidding documents electronically or can be examined without charge at the Engineer's office. Each bid shall be accompanied by a bid guarantee in the form of a certified check, cashier's check, or acceptable Bid Bond, payable to Harris County Municipal Utility District No. 70, in an amount not less than 5% of the maximum Bid price submitted, as a guarantee that the bidder will enter into a contract within Ten (10) days after receipt of the contract documents. Check shall be drawn on a responsible bank in the state and a bid bond shall be issued by a surety legally authorized to do business in the state. The right is reserved, as the interest of the district may require, to reject any or all bids and/or to waive any irregularities in bids received. Additionally, 24 hours after bids are opened, they cannot be withdrawn. The Work will be substantially complete within [ 90 ] days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within [ 120 ] days after the date when the Contract Times commence to run. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price
Bid Results
Water / Sewer
$68,400.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2021
November 24, 2021
7518 Connemara Dr, Cypress, TX
Related To This Project
Cypress, TX
--
Cypress, TX
--
Cypress, TX
--
Cypress, TX
--
Cypress, TX
--
Cypress, TX
--
Cypress, TX
--
Cypress, TX
Bid Date: Aug 18 2022
Cypress, TX
Bid Date: Apr 21 2022
Cypress, TX
--
Cypress, TX
--
Cypress, TX
--
Cypress, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.