BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Cypress, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work primarily consists of blasting, repairing pitted areas, repairing other holes found, and applying an NSF approved protective coating system per specifications in the interior of the existing 429,000-gallon ground storage tank located at Harris Counties Municipal Utility District No. 70's water plant on 7518 Connemara Dr. Additionally, a 16" valve must be replaced The above-described construction will be performed in accordance with plans and specifications and any addenda thereto which may be issued prior to forty-eight (48) hours before the opening of bids. Prospective bidders may obtain drawings, specifications and bidding documents electronically or can be examined without charge at the Engineer's office. Each bid shall be accompanied by a bid guarantee in the form of a certified check, cashier's check, or acceptable Bid Bond, payable to Harris County Municipal Utility District No. 70, in an amount not less than 5% of the maximum Bid price submitted, as a guarantee that the bidder will enter into a contract within Ten (10) days after receipt of the contract documents. Check shall be drawn on a responsible bank in the state and a bid bond shall be issued by a surety legally authorized to do business in the state. The right is reserved, as the interest of the district may require, to reject any or all bids and/or to waive any irregularities in bids received. Additionally, 24 hours after bids are opened, they cannot be withdrawn. The Work will be substantially complete within [ 90 ] days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within [ 120 ] days after the date when the Contract Times commence to run. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price

Bid Results

Water / Sewer

$68,400.00

Public - County

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
57
Bidding Soon
2,755
All Active Projects
1,129
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.