BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of an educational facility in Conway, South Carolina. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

The District is soliciting proposals from firms to perform Integrated Project Delivery services to repair, renovate, reconstruct, and/or replace tennis courts and tracks and fields, including new synthetic turf infields (and/or surrounding stadiums) at various high school facilities throughout the District. Project Location: Various High School Facilities throughout the District PERFORMANCE & PAYMENT BONDS: 100 % of construction phase cost of the work. The majority of Phase III work is anticipated to begin in February 2022 and be substantially complete by August 15, 2022. The work at Conway High School can extend into November 2022 since it will not affect the football season. Project construction is anticipated to start early 2022, requiring phasing of the work. The District intends to hire one (1) firm to provide General Construction services as may be required for the repair/renovation/reconstruction/replacement of tennis courts and tracks and fields, including synthetic turf infields (and/or surrounding stadiums). The projects included in the work planned in this RFP covers an approximate three (3) year period from 2022 through the 2024-2025 school year. Provide a preliminary schedule of the work to be completed in Phase III (as shown in the Summary of Services, Section 3.2) including how the work would be staffed, assuming a project schedule that starts February 1, 2022 and a Substantial Completion Date of August 15, 2022. Also assume that the fields at both Socastee High School and St. James High School CANNOT be inaccessible at the same time due to their proximity of one another and their use of the same municipal fields when needed. 2.9 Provide a preliminary schedule of the work to be completed in Phase III (as shown in the Summary of Services, Section 3.2) including how the work would be staffed, assuming a project schedule that starts February 1, 2022 and a Substantial Completion Date of January 31, 2023. Also assume that the fields at both Socastee High School and St. James High School CANNOT be inaccessible at the same time due to their proximity of one another and their use of the same municipal fields when needed.

Award

Educational

$680,000.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
71
Bidding Soon
915
All Active Projects
381
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 10, 2021

February 1, 2022

August 15, 2022

img_map_placeholder

Multiple Locations, Conway, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.