BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a mixed-use development in Port Saint Lucie, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Northport 24" Force Main Project on Glades Cutoff Road in Port St. Lucie consists of a 24" force main that starts at Glades Cutoff Road south of Midway Road near Canal 105. From there it will proceed south to connect with an existing 24" force main on Glades Cutoff Road at the intersection with Commerce Centre Parkway. The project includes approximately 8,240 linear feet of 24" main, two 24" x 16" stub-outs for future connections, a 24" x 24" stub-out for a future connection, 24" line stops, 24" tapping sleeve and valve, 24" plug valves, air release valves, piping fittings, replacement of sidewalks, roads and restoration of sod, and all other necessary appurtenances. It also includes a directional bore of 1,790 linear feet under Interstate Highway I-95. All work shall be in accordance with the Technical Specifications and Construction Plans prepared by Kimley Horn consisting of pages 1 - 28 (Attachment A). The Contract period is estimated at three hundred and thirty-three (330) calendar days with no renewal options. The Contractor must have all required licenses and certifications necessary to perform this work. The approved license for this work includes a State of Florida General Contractor License and Underground Utility License. A copy of said certification is to be submitted with the Bid Documents. It is the Contractor's responsibility to verify with the City of Port St. Lucie Building Department that their current license allows them to perform this work prior to submitting a bid. The City of Port St. Lucie reserves the right to reject any and all proposals, to waive any and all informalities or irregularities, to negotiate with any qualified Proposers, and to accept or reject all or any part of any proposal as it may deem to be in the best interest of the citizens of the City. Thank you for doing business with the City of Port St. Lucie.

Award

Water / Sewer

$3,622,820.00

Public - City

Paving, Site Work

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
46
Bidding Soon
713
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2021

December 8, 2021

img_map_placeholder

Glades Cut Off Rd, Port Saint Lucie, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.