BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 4, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a mixed-use development in Dallas, Texas. Completed plans call for site work for a educational facility; and power facility.

New 6,000 square foot, double volume conditioned Satellite Energy Plant (SEP) with initial buildout of 500-tons of cooling capacity and 6,000MBH of heating capacity, with the ability to add 2,000 tons of future cooling capacity and 12,000 MBH of heating capacity. 2,000 square feet of flatwork will be required for the adjacent cooling tower yard. Hydronic systems will extend from new SEP to new Nursing building and Welcome center on campus and will integrate into existing campus loop. This project has an WMBE goal of 30%.

Post-Bid

Solar Power Generation

$32,154,000.00

Public - County

Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
133
Bidding Soon
3,911
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

June 20, 2022

Project location map

4849 W Illinois Ave, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.