Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a 328,696-square-foot playground / park / athletic field; and sidewalk / parking lot.
https://www.minneapolisparks.org/news/2022/01/20/father-hennepin-bluff-park-will-undergo-major-renovation-in-2022/ Father Hennepin Bluff Park will undergo major renovation in 2022 Posted on 20 January, 2022 Last night Minneapolis Park and Recreation Board (MPRB) Commissioners approved a construction contract to renovate and improve Father Hennepin Bluff Park. The project includes: A new performance stage and attached seasonal restroom facility New park entry plaza spaces Upgraded lights, path connections, wayfinding signage and trail markings Landscape and stormwater management improvements Follow the link below to view the project design and some illustrations of the new stage/restroom facility: Father Hennepin Bluff Park Improvements Design [PDF] Timeline Some initial work will occur in the park this winter to set the stage for full-scale construction beginning in the spring. Most of the park will be under construction starting Spring 2022, with work expected to be complete in Fall 2022. Park Access At this point there are no plans to fully close access to the park during construction, but please stay away from areas that are fenced off or where construction is happening. Construction updates will be sent periodically throughout the year with information on park access. Visit the Father Hennepin Bluff Park Improvements project page and sign up for email updates to stay informed. There are two other public infrastructure projects in the area that may impact park access: The Metropolitan Council is performing nearby sewer repair that closed Main Street SE to motorized traffic between Merriam Street and 3rd Avenue SE beginning Jan. 3, 2022 through April 2022. Please visit the Minneapolis East Interceptor Rehabilitation project page for more information. The Minnesota Department of Transportation (MNDOT) is planning to begin a project to repair the Stone Arch Bridge in 2022. That project may include short-term closures of the bridge and impacts to park access through 2024. Please visit the MNDOT Stone Arch Bridge project page for more details. Environmental Impact Throughout the design process and during construction, the MPRB coordinates efforts to preserve as much of the existing tree canopy at the park as possible. This coordination will result in many trees being preserved, however, some tree removal is unavoidable to safely complete these park improvements. This project will also improve stormwater management at the park and reduce untreated runoff into the Mississippi River. Stay Informed Visit the Father Hennepin Bluff Improvements project page to learn more about the project and sign up for email updates to stay informed. Updates will be sent via email and posted on MPRB social media channels throughout construction. _____________________________________________________________________________________________________________________________ 20154 The City of Minneapolis is issuing this Call for Bids for prospective suppliers to provide all materials, labor, equipment and incidentals for the construction of the Park Improvements at Father Hennepin Bluff Park project, for the City of Minneapolis, all in accordance with the provided specifications, event line items and all documents requested herein. A contractor responding to this solicitation document swears that they are in compliance with the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3, and shall upon request submit to the city a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria. This Project shall generally include the work shown on Drawings related to the Park Improvements at Father Hennepin Bluff Park. The Work shall include, but is not limited to: o Mobilization o Erosion and Sediment Control o Site Demolition and Removals o Earthwork and Drainage o Underground Utilities o Concrete Work o Erection of Trellis and Canopy o Paint Striping o Pervious Pavers over Infiltration Bed o Installation of Site Furnishings o Finish Grading o Seeding and Turf Establishment o Miscellaneous Site Restoration Work of the Project consists of all labor, materials, articles, equipment, incidentals, items, tools, services, supplies, methods, operations, and skills in such quantities as may be necessary to complete the project within the intent of the Contract Documents
Award
Playgrounds / Parks / Athletic Fields
$2,099,250.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 9, 2021
May 2, 2022
420 SE Main St, Minneapolis, MN
Related To This Project
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Feb 08 2022
Minneapolis, MN
Bid Date: Mar 08 2022
Minneapolis, MN
Bid Date: Jan 28 2022
Minneapolis, MN
Bid Date: Feb 09 2022
Minneapolis, MN
Bid Date: Jan 13 2022
Minneapolis, MN
Bid Date: Sep 21 2023
Minneapolis, MN
Bid Date: Sep 19 2023
Minneapolis, MN
Bid Date: Mar 01 2022
Minneapolis, MN
Bid Date: Mar 11 2022
Minneapolis, MN
Bid Date: Mar 11 2022
Minneapolis, MN
Bid Date: Mar 10 2022
Minneapolis, MN
Bid Date: Mar 03 2022
Minneapolis, MN
Bid Date: Jan 14 2022
Minneapolis, MN
Bid Date: Mar 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.