BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Spring Hill, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Hernando, Turnpike Road Name: Unpaved Shoulder Grading & Sodding - Zone 4 Limits: Midpoint Project(S): 19077445221(*) Federal Aid No: N/a Total Roadway Length: 0.000 Miles Contract Days: 120 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 14 The Work Specified in This Contract Consists of Providing All Labor, Materials, Equipment and Incidentals Necessary to Repair and/or Restore Unpaved Shoulders, Including Site Preparation, Grading, Finish Soil Layer Preparation, Sodding, and Watering, at Various Locations on the Suncoast Parkway, Milepost (Mp) 40.0 to 45.0. Prior to Beginning Work Under This Contract, the Contractor Shall Submit to the Engineer for Approval, Two Copies of the Contractor's Proposed Plan and Methods for Performing the Work, Including a Listing of Equipment and Personnel Anticipated for Use. The Contractor Shall Perform All Work During Day Hours in Accordance With the Turnpike Lane Closure Policy. No U-turns Shall Be Permitted as a Condition of This Contract, Except at Service Plazas No Pre-bid Conference Will Be Held for This Project. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 001 Unpaved Shoulder Grading and Sodding FPID(S): 190774-4-52-21

Award

Roads / Highways

$286,700.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
54
Bidding Soon
1,140
All Active Projects
453
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2021

November 19, 2021

img_map_placeholder

Suncoast Pkwy, Spring Hill, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.