EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 14, 2022 at 7:00 PM

Updated September 15, 2023

Site work and paving for a sidewalk / parking lot in Galveston, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of January 14, 2022 the project has not been awarded yet.** This project is to include building modifications and the installation of escalators and elevators at Cruise Terminal 1 and Shearn Moody Plaza Garage, for the Port of Galveston, Galveston, Texas (hereinafter called Owner). The port will accept questions about this RFB and about any matter related to the scope of work through 2:00 p.m. (CST) on Wednesday, October 27th, 2021. Attendance is not mandatory, but highly encouraged. Attendees are REQUIRED to provide their own PPE for the site visit including steel toed shoes, safety vest, and hard hat. TWIC cards are recommended. Bids shall be submitted in sealed envelopes upon the blank form of proposal furnished. Sealed envelopes shall be marked in the lower left hand corner. Do Not Open in Mail Room Submitted in Response to Request for Bids (RFB) 2021-013 Cruise Terminal 1 Walkway Circulation Improvements To be Opened and Read Aloud in Public at 2:00 p.m., Wednesday, November 10th, 2021" Address envelopes as follows: Board of Trustees of the Galveston Wharves Attention: Procurement Manager 123 25th Street, 8th Floor Galveston, Texas 77550 The Board of Trustees of the Galveston Wharves will award this bid to the bidder who provides the requested goods or services at the best value for the Port, which will include an analysis of the following criteria: purchase price, reputation of the bidder and of the bidder's goods or services, the quality of the bidder's goods or services, the extent to which the goods or services meet the Port's needs, the bidder's past relationship with the Port, the impact on the ability of the Port to comply with laws and rules relating to historically underutilized businesses and non-profit organizations employing persons with disabilities, and the total long term cost to the Port to acquire the bidder's goods or services. The Board reserves the right to reject any or all of the bids, in whole or in part, and to accept the bid or bids, in whole or in part, for any reason or to negotiate with any and all bidders and waive any informality in bids received. Bidder(s) may withdraw their bid, either personally or by written request, at any time prior to the scheduled time for the bid opening. The Galveston Wharves may hold the bids for 60 days after the date set for the opening without making a decision and the bidder(s) may not withdraw their bid(s) within that time.

Post-Bid

Sidewalks / Parking Lot

$630,000.00

Public - Federal

Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Protection, Roofing and Siding Panels, Metal Roof Panels, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Drilled Concrete Piers and Shafts, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Drilling Equipment, Assembly and Testing Equipment, Applicators

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
68
Bidding Soon
2,597
All Active Projects
944
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2021

December 17, 2021

img_map_placeholder

Multiple Locations, Galveston, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.