Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Atlanta, Georgia. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
To build out the Northwest Transportation Center. The successful construction manager will be expected to provide all the services included in the standard APS Construction Management at Risk Contract for building improvements. The initial contract will be a lump sum contract for the provision of pre-construction services. The lump sum fee for the pre-construction services is set out in the Fee Sheet attached in Bonfire. Additionally, the Construction Management percent of general conditions and percent fee for the construction phase will also be set with the initial contract. During the pre-construction services stage, Construction Manager shall submit a Guaranteed Maximum Price (GMP) to Atlanta Public Schools for the Project in the entirety, and/or for phases or portions of the Project. If a GMP is accepted by Atlanta Public Schools, the contract shall be amended to add and incorporate the GMP into the contract (each a "GMP Amendment"). Atlanta Public Schools shall have no obligation to accept any GMP. Contingent award letter sent to Vendor 08/08/22 Draft #1 GMP due to APS 08/29/22 Draft #2 GMP due to APS 10/14/22 Draft #3 GMP due to APS 11/15/22 Final GMP to APS 12/30/22 Board Approval 01/06/23 Contract Execution Deadline 01/24/23 As of December 5, 2022, the project has been awarded. A timeline for construction has not been confirmed. Notice to Proceed 02/07/23 Project Substantial Completion 07/30/24 All questions or requests for clarification must be sent via Electronically. Questions Due Date: Jun 17th 2022, 2:00 PM EDT PN - 2022-0030, 0220220, 202028 Construction Budget: $12,536,936 project cancelled Estimated Notice to Proceed- construction services 04/17/23 Estimated Project Substantial Completion 06/30/24 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Post-Bid
Educational
$60,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2022
March 30, 2023
3475 Donald Lee Hollowell Parkway, Atlanta, GA
Related To This Project
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
Bid Date: Nov 16 2022
Atlanta, GA
--
Atlanta, GA
Bid Date: Nov 29 2022
Atlanta, GA
Bid Date: Dec 08 2022
Atlanta, GA
--
Atlanta, GA
Bid Date: Jan 31 2023
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
Bid Date: Dec 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.