BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Weston, Florida. Contact the soliciting agency for additional information.

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 01 Selection Method : Expanded Letter of Response Professional Liability Insurance :$500,000.00 I-75 (SR 93) From Broward County Line to W of Bridge Nos TRC Members (Subject to Change) : Gerald Byrne Leighton Elliott William Whidden This contract will require field office personnel; therefore all firms performing inspection services must utilize CEI field office rates. The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. I-75 (Sr 93) From Broward County Line to W of Bridge Nos.030243/030244; I-75 (Sr 93) From West of Bridge Nos. 030243/030244 to Toll Booth Financial Management Number(s) 444008 2 62 01; 444008 3 62 01 Longlist Date/Time 11/08/2021 08:30 pm Shortlist Selection Date/Time 11/16/2021 08:30 pm Final Selection Date/Time 11/30/2021 08:30 pm Negotiations Period Begin Date 12/15/2021 Negotiations Period Ending Date 2/01/2022 The method of contractor selection has not been determined at this time. FDOT - RFP - CEI I-75 (SR 93) From Broward County Line to W of Bridge Nos

Award

Roads / Highways

$4,827,990.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
46
Bidding Soon
1,109
All Active Projects
492
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2022

img_map_placeholder

I-75, Weston, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.