BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in De Tour Village, Michigan. Completed plans call for site work for a water / sewer project.

751-17069 It is requested that contractors intending to attend the walkthrough RSVP to the PSC and DTMB-DCD Project Director prior to 5pm on October 25, so that any weather assessment on October 27 that results in a rescheduling of the date from the 28h to the 29th can result in notification to participants no later than noon on the 27th. The boat will leave DeTour Harbor at 10:15 AM for Lime Island. Due to boat capacity limitations, the contractor will be limited to one walkthrough inspection participant. NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. COVID 19 Precautions: 1. Any individual inside a state building must wear a face mask, irrespective of vaccination status. This applies in all State owned and leased facilities throughout the State of Michigan, including all common areas such as areas where individuals are waiting to enter a facility, cubicles, offices, conference rooms, elevators, stairwells, kitchens, bathrooms, and hallways. 2. Any individual outside a state office building must wear a face mask if social distancing cannot be maintained. 3. Requirements may change at any time and any updated guidance must be followed to be allowed to attend any meetings and for a firm to be eligible to submit bids / quotations / proposals. 4. Bring and be prepared to wear a mask if required upon arrival. The Work, Lime Island Harbor Improvements Project, Michigan Dept of Natural Resources - Parks and Recreation Division (PRD), includes, but is not necessarily limited to: Removal of existing dock structures within the harbor; Construct a new rubble mound breakwater; A new dock structure and finger piers will be constructed along with appurtenances; Site work includes removal of topsoil and placement of new aggregate area. This project is located at the Lime Island State Harbor. Phase 1 includes the installation of a gravel pathway, installation of rip rap along the shore of the island, installation of steel piling and framing, installation of timber decking and installation of a rubble mound breakwall

Bid Results

Water / Sewer

$1,315,648.00

Public - State/Provincial

Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
14
Bidding Soon
152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

February 11, 2022

Project location map

600 Ontario St, De Tour Village, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.