BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition for a power facility in Anaheim, California. Completed plans call for the demolition of a power facility.

Online Q&A Yes Q&A Deadline 10/28/2021 5:00 PM (PDT) The City is seeking a professional consultant that can prepare an extensive written Demolition Plan for the Kraemer Power Plant. This plan will be directly advertised to seek public bids from licensed contractors to complete the work as stated in the Demolition Plan. All buildings, structures and hardscape within the perimeter walls will be part of the demolition plan. The selected consultant shall prepare a detailed plan that includes a minimum of the following scope. Any other details that proposer believes should be included in the Demolition Plan shall be stated in their proposal. 1. Project Executive Summary 2. Existing Conditions 3. Demolition Plan 4. Demolition project specifications 5. Contractor Implementation of Demolition Plan 6. Contractor Staffing of Demolition 7. Grading Plan - Complete engineered grading plan stamped by a professional engineer as required by the City of Anaheim Public Works Department. Final surface material will be gravel. Provide a separate optional cost for hydrology study if required by Public Works. A Water Quality Management Plan (WQMP) will not be required. 8. Utility Demolition Plan - Complete utility demolition plan stamped by a professional engineer, show capping of all utilities serving the site as required by the City of Anaheim Public Works Department. 9. Building Department Demolition Plan - As required by the City of Anaheim Building Department. 10. Comprehensive permit planning required by all government entities for demolition of this type of power plant. 11. Engineer's Estimate of Demolition Costs 12. Construction Safety and work site risk assessment 13. Other demo planning items not listed that the proposer believes should be included in Demolition plan to ensure all items are handled and contractors have sufficient information to bid the project and successfully demo the facility.

Award

Power Plant

$113,170.00

Public - City

Demolition

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
109
Bidding Soon
2,313
All Active Projects
1,032
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2021

December 6, 2021

img_map_placeholder

1144 N Kraemer Blvd, Anaheim, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.