BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Cincinnati, Ohio. Contact the soliciting agency for additional information.

For proposal preparation purposes, offerors may assume a contract start date of 05/01/2022. L-23 Local Clauses EPA-L-15-102 TECHNICAL QUESTIONS Offerors must submit all technical questions concerning this solicitation electronically through FedConnect. In order to submit questions, offerors must register in FedConnect at www.fedconnect.net, see main page for registration instructions. For assistance in registering or for other FedConnect technical questions please call the FedConnect Help Desk at (800) 899-6665 or email at support@fedconnect.net. Only those technical questions posted through FedConnect will be accepted. EPA must receive technical questions no later than 10 calendar days after the issuance date of this solicitation. EPA will utilize FedConnect to issue amendments to the solicitation (e.g., to answer technical questions which may affect proposal submittal). EPA will not reference the source of the questions. EPAAR 1552.211-73 LEVEL OF EFFORT-COST-REIMBURSEMENT CONTRACT. (MAY 2016) (a) The Contractor shall perform all work and provide all required reports within the level of effort specified below. The Contractor shall provide up to TBD at TO level direct labor hours for the base period. The Government's best estimate of the level of effort to fulfill these requirements is provided for advisory and estimating purposes. The Government is only obligated to pay for direct labor hours ordered and corresponding fixed fee for labor hours completed. (b) Direct labor includes personnel such as engineers, scientists, draftsmen, technicians, statisticians, and programmers, and not support personnel such as company management or data entry/word processing/accounting personnel even though such support personnel are normally treated as direct labor by the Contractor. The level of effort specified in paragraph (a) of this section includes Contractor, subcontractor, and consultant non-support labor hours. (c) If the Contractor provides less than 90 percent of the level of effort specified for the base period or any optional period exercised, an equitable downward adjustment of the fixed fee, if any, for that period will be made. The downward adjustment will reduce the fixed fee by the percentage by which the total expended level of effort is less than 100% of that specified in paragraph (a). (For instance, if a hypothetical baseperiod LOE of 100,000 hours is being reduced to 70,000, the fixed fee shall also be reduced by the same 30%. Using a corresponding hypothetical base-period fixed fee pool of $300,000, the reduced fixed-fee amount is calculated as: $300,000 x (70,000 hours/100,000 hours) = $210,000.) (d) The Government may require the Contractor to provide additional effort up to 110 percent of the level of effort for any period until the estimated cost for that period has been reached. However, this additional effort shall not result in any increase in the fixed fee, if any. (e) If this is a cost-plus-incentive-fee (CPIF) contract, the term "fee" in paragraphs (c) and (d) of this section means "base fee and incentive fee." If this is a cost-plus-award-fee (CPAF) contract, the term "fee" in paragraphs (c) and (d) means "base fee and award fee." (f) If the level of effort specified to be ordered during a given base or option period is not ordered during that period, that level of effort may not be accumulated and ordered during a subsequent period. (g) These terms and conditions do not supersede the requirements of either the "Limitation of Cost" or "Limitation of Funds" clauses

Post-Bid

Water / Sewer

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
130
Bidding Soon
2,163
All Active Projects
1,092
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 17, 2022

November 17, 2022

November 17, 2027

img_map_placeholder

To Be Determined, Cincinnati, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.