BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Regina, Saskatchewan. Completed plans call for the construction of a 128,090-square-foot, three-story above grade educational facility; and for site work for a educational facility.

REGINA - The sod has been turned on a new joint use school to be built in north Regina. The new school will replace four aging school facilities: St. Peter, St. Michael, McDermid and Imperial elementary schools, all of which were built between 1950 and 1960. The sod turning took place outside the Imperial Community School on Broad Street, the site chosen for the new school. The province has allocated $65 million to the new school build with the city of Regina providing funding for the community space along with it. The new facility will to be 11,186 square meters and is expected to be open by fall 2025. Once completed, it will accommodate around 800 students from the Regina Public and the Catholic divisions for prekindergarten to grade 8, with an ability to expand to 1,000. In addition to a community space, there will be a 51-space child care centre. What is not yet confirmed is what the name will be for the new school going up at the location. Regina Public Schools says it is launching a Name Your School campaign and is seeking suggestions of potential names from their communities. More details will be provided on the Regina Public Schools website and social media channels. Premier Scott Moe, Education Minister Jeremy Cockrill and City of Regina Mayor Sandra Masters were on hand for the sod turning, as were Regina Board of Education Chairperson Sarah Cummings Truszkowski and Regina Catholic Schools Board Chair Shauna Weninger. Prior to the sod turning, they were joined by a number of students inside the school. “Over the course of the next number of months and years and a bit, you’re going to see a lot of things change on this site,” Moe told the kids in attendance. “Fences are going to go up and there’s going to be a school built, and you were young enough that you will probably likely are going to have the opportunity to attend that school so I encourage you to watch that progress happen over that period of time.” This sod turning follows on the previous announcement in June that a site had been selected for the new joint use school in the area. It also follows on a string of other recent announcements about schools that either have been built or are on the way. In September, a new joint use school in Lakeview, the Argyle and Ecole St. Pius X school, was opened to replace existing schools there. As well, a second joint use school had been announced this year for the Harbour Landing area to accommodate the booming population, and officials are hoping for the sod to be turned and for construction to begin there. For the new school on the Imperial site it is a long time coming. The school divisions had been planning for over a decade to replace the aging facilities already serving north Regina. In speaking to reporters at City Hall later that day, Mayor Masters welcomed the start of construction. “Schools are the centre of our communities, of all of our communities within communities, those areas, those neighbourhoods that I raised my kids in, that if you have kids you raise kids in” said Masters. “Even if you don’t have kids they add life, vitality, future hope to every city and every community. The investment in schools in the city of Regina is profoundly welcome.” ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Construction of a joint-use school facility (Pre-Kindergarten to Grade 8) multi-story school joint use facility with the Regina Public Schools and Regina Catholic Schools that includes an additional integrated childcare facility, approximately 450 square meters in size. The facility will be built at the site of the existing Imperial Community School. Method of delivery is design-bid-build. The Owner, a co-ownership between the Regina Catholic School Division, the Regina Public School Board Division #4, and the City of Regina have pre-qualified the five below listed contractors through an earlier RFP Process that was posted on Sasktender under RFP#: 2223-33. Only Bids from pre-qualified General Contractors will be considered by the Owner. Other contractors interested in submitting pricing are encouraged to reach out to the below five pre-qualified General Contractors.

Award

Educational

$57,276,143.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
6
Bidding Soon
98
All Active Projects
40
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2023

September 15, 2023

img_map_placeholder

200 Broad St, Regina, SK


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.