Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 22, 2022 at 8:00 PM
Updated November 15, 2023
Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.
Estimated Construction Cost: $750,000 to $2,000,000 Water main improvements at two campus locations, noted as Ridgewalk Water and Hopkins Lane Water improvements. The Ridgewalk Water improvements consist of transferring various water connections from a campus pressure system to another campus water pressure system. The Hopkins Lane Water improvements consist of installation of new water main along Hopkins Lane. The University seeks Contractors with demonstrated experience in water utility construction within an highly trafficked pedestrian corridor and active streets. Specific experience requirements include: installation of 1" through 12" water main piping and associated water appurtenances. Anticipated construction duration of 6 months. The Contractor shall have demonstrated an average annual business revenue of at least $2,000,000 over the last five (5) consecutive years. The Contractor must have demonstrated experience on their best three (3) comparable projects with the Contractor providing services as General Contractor within the last ten (10) years. Projects should have possessed the following construction challenges: urban site with limited construction and staging areas; pipeline installations requiring proactive and innovative solutions; project complexity requiring tracking of multiple construction phases; critical path construction, phasing plan development, and execution. Prequalification Submission: Each prospective Contractor must submit electronically one (1) complete prequalification questionnaire in PDF format. Prequalification Questionnaires shall be emailed to the following email address(es): Ann K. Ho, Contracts Administrator Email: akh008@ucsd.edu Cc: klsantiago@ucsd.edu No Prequalification Questionnaire will be received after 4:00 P.M., Tuesday, October 26, 2021. In lieu of mandatory Prequalification Meeting, Intent to Submit in writing (via email to akh008@ucsd.edu and rkunishige@ucsd.edu must be received by 4:00 P.M., Tuesday, October 19, 2021 in order for your firm to submit Prequalification Questionnaire. Confidentiality of the information provided will be respected to the extent permitted by law. Response to the Prequalification Questionnaire must be submitted on the forms contained within the Prequalification Questionnaire available at the address above. All information requested in these forms must be provided in order to be considered "responsive" to the requirements of the prequalification. The University contacts are Ross Kunishige, Project Manager, Capital Program Management (858) 822-4841 or Rhonda Mitchell, Contracts Manager, Capital Program Management (858) 822-3126.
Post-Bid
Water / Sewer
$2,000,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
