BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Bloomington, Minnesota. Completed plans call for site work for a water / sewer project.

As of 05/02/2022 The bid tab will become public information and available after the Bloomington City Council awards the contract. It is expected to be considered at the May 9 Council Meeting. The apparent low bidder is Minger Construction. Approximately 5500 cubic yards of common excavation, 2. Approximately 10000 tons of bituminous plant mixture, 3. Approximately 5200 cubic yards of Class 5 aggregate base, 4. Approximately 2500 linear feet of concrete curb and gut- ter, 5. Approximately 17500 square feet of 4" to 8" concrete walk, 5. Approximately 2500 linear feet of 8" to 24" sanitary sewer, 6. Approximately 600 linear feet of 24" sanitary sewer (trenchless), 7. Approximately 300 linear feet of 12" to 60" storm sewer

Award

Water / Sewer

$3,800,000.00

Public - City

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
142
Bidding Soon
1,549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

June 27, 2022

Project location map

American Blvd W, Bloomington, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.