BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in McGregor, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a water / sewer project; and water / sewer project.

This project is to construct a new Front Street Lift Station and corresponding Force Main. The work consists of providing all labor, materials, tools, and equipment necessary for construction of a new duplex submersible type sewage lift station with above grade valve enclosure. The sewage lift station work includes providing two (2) submersible raw sewage pumps, process piping, electrical systems, pump controls, SCADA, site work and landscaping, underground utility work and appurtenances associated with the sewage lift station and force main. There will also be restoration of disturbed asphalt and curb & gutter. Major bid items are as follows: New Lift Station Equipment & Structure 340 lin. ft. 4" C900 PVC Force Main, Trenched 120 GPM Raw Sewage Pumps (x2) 200 lin. ft. 4" C900 Fused PVC, Horiz. Dir. Drilled Pump Controls & SCADA 112 tons HMA Pavement New Electrical Service 234 tons Aggregate Base Retaining Wall & 2" HMA Driveway 25 lin. ft. 30" Concrete Curb & Gutter Each bid shall be accompanied by a bid bond, certified check, cashier's check, or credit union certified share draft in an amount equal to five percent (5%) of the total amount of the bid. The successful bidder shall furnish a 100% Performance Bond and a 100% Payment Bond on the forms provided in the Bidding Documents. The Contract shall be Substantially Complete for Lift Station to be ready and operational by April 1, 2022, Final Restoration and Paving Completion by June 30, 2022, and Ready for Final Payment by July 31, 2022. Bids will be considered, and a Public Hearing held by the City Council, City of McGregor, at the City Hall, 416 Main Street, McGregor, Iowa, 52157, at 6:30 P.M., Wednesday, November 17th, 2021 The City Council reserves the right to reject any or all bids, to waive any informality in bidding and to accept the bid as it deems to be in the best interests of the City.

Award

Water / Sewer

$508,744.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
19
Bidding Soon
330
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2021

December 17, 2021

img_map_placeholder

Front St, McGregor, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.