BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Plano, Texas. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of January 25, 2022, the project has been cancelled. It has not been confirmed if the project will go out for rebid. The City of Plano is soliciting for the replacement of approximately 1,700 linear feet of Hike & Bike trail. Project tasks also include the installation of a gabion wall along the edges of an adjacent drainage channel as mitigation against the ongoing erosion and undercutting of the drainage channel. Pre-Bid Meeting To attend the non-mandatory pre-bid meeting, access the Skype Teleconference via the information below: https://meet.plano.gov/amorales/1TJH02Q0 (972) 941-5885 & Conference ID: 6048050 Include a bid bond or a bid guarantee in the form of a cashier's check or certified check in an amount not less than five percent (5%) of the total maximum bid price. This is a guarantee that the bidder will enter into a contract and execute the performance bond and the payment bond on the forms provided in this solicitation. Checks shall be issued by a national or state bank and the bid bond shall be from a reliable surety company. The successful bidder must furnish a performance bond, on the form provided, in the amount of one hundred fifteen percent (115%) of the contract price. Successful bidder must also provide a material and labor payment bond, on the form provided, in the amount of one hundred percent (100%) of the contract price. Bonds must be from an approved surety company holding a permit from the State of Texas to act as surety, or other sureties acceptable to the Owner. Delivery of applicable bonds to the City no later than ten (10) days after notice of award is required. Submit all questions on the solicitation's question portal on PlanoTX.ionwave.net by the Question Deadline. Answers will be provided via the IonWave interface or addenda on PlanoTX.ionwave.net. Question Cutoff Date: 11/16/2021 02:00 PM (ET) This project has 180 working days allowed for TOTAL completion, Monday-Friday, 7:00 AM - 6:00 PM. The amount for liquidated damages is anticipated to be $1,000 for each day work remains incomplete after the time specified Estimated expenditure is $1,283,488. Owner reserves the right to reject any and all sureties, including but not limited to those sureties who are now in default or delinquent on any bonds or who are interested in any litigation against Owner. Exclusive venue for any lawsuit in connection with such bonds shall be specified as Collin County, Texas Project No. 23557

Project Abandoned

Sidewalks / Parking Lot

$1,399,835.00

Public - City

Paving, Site Work

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
67
Bidding Soon
3,542
All Active Projects
1,407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.