Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
Site work for a road / highway in Wake Forest, North Carolina. Conceptual plans call for site work for a road / highway.
Update: Addition of Traffic Signals at intersections that have met signal warrants or need to be studied. Project is included in Town of Wake Forest Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://www.wakeforestnc.gov/sites/default/files/uploads/departments/finance/CIP/cip_fy_24-29_final_draft_-_1.2.24.pdf The Aquatic Center is in need of an extensive amount of renovation in its main pool area. This is to repair damage caused by excessive airborne levels of chlorine due to an improperly designed/installed HVAC system. The current system has corroded and is in urgent need of rehabilitation. Project is included Town of Wake Forest Fiscal Year 2024-2029 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Addition of Traffic Signals at intersections that have met signal warrants or need to be studied. Forestville Road/Song Sparrow - FY 22-23 Wait Avenue/Middlegame - FY 22-23 Forestville/Coach Lantern - FY 22-23 As of October 22, 2021, this project is included Town of Wake Forest FY 2021-2025 CIP. The design completion and firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$770,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
Multiple Locations, Wake Forest, NC
Related To This Project
Wake Forest, NC
Bid Date: May 22 2025
Wake Forest, NC
--
Wake Forest, NC
Bid Date: Jul 24 2025
Wake Forest, NC
Bid Date: Jul 01 2025
Wake Forest, NC
--
Wake Forest, NC
Bid Date: Aug 20 2025
Wake Forest, NC
Bid Date: Sep 22 2025
Wake Forest, NC
--
Wake Forest, NC
--
Wake Forest, NC
--
Wake Forest, NC
--
Wake Forest, NC
--
Wake Forest, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
