BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a conference / convention center in Saint Augusta, Minnesota. Conceptual plans call for the renovation of a conference / convention center.

The St. Cloud Civic Center opened in 1988 as a 110,000 square foot convention facility. In January 2012 the second phase of a major expansion was completed, bringing the facility to 195,000 square feet. After several years' effort the City secured state bonding support for completion of the project - an $11.56 million parking ramp adjacent to the facility in December 2016. The original building is now 30 years old and requires replacement of some major mechanical elements. In 2019, the City engaged the Apex group to assess and inventory mechanical and structural needs of our community facilities. Major critical expenditures needed at the Convention Center include: Replacement of original roof ($1,510,000), Replacement of original roof top units and HVAC controls ($2,100,000) and, Replacement of original The roof and mechanical elements listed above are all well beyond their reasonable life expectancies. The facility is experiencing increasing frequency of repairs, raising the burden on the operating budget. Some of the HVAC components are no longer made and must be fabricated to make repairs. Extraordinary repair costs in 2017 exceeded $80,000; 2018 extraordinary costs were about $45,000 but responsibility for one major item is in dispute, so the total may rise. As December 15, 2022, this project is currently in the FY 2023 - 2028 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Conference / Convention Centers

$4,300,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
62
Bidding Soon
1,416
All Active Projects
501
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 2, 2024

img_map_placeholder

10 4th Ave S, Saint Augusta, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.