Site work for a water / sewer project in Lima, Ohio. Completed plans call for site work for a water / sewer project.

The Project includes the complete furnishing and installation of all labor, equipment, and materials, for one 150,000 gallon elevated water storage tank. It also includes, the foundation design, excavation and backfill, site work, valves and piping accessories, gravel access drive, electrical work, SCADA system, and painting. The estimated cost of the Rudolph Foods Water Storage Tank Project is $1,500,000. Each bidder shall submit with their bid a bid guaranty in the form of either a bond for the amount of 100% of the bid amount or a certified check, cashier's check, or letter of credit in the amount of 10% of the bid in accordance with Ohio Revised Code, Section 153.54. The form of the bond shall be in accordance with the requirements of Ohio Revised Code, Section 153.54. Security shall be drawn in favor of the Allen Water District. Other submittal requirements are listed in the Bidding Documents in Section 00 4393, Bidder's Checklist. The Owner reserves the right to accept or reject any or all Bids, to waive any irregularities in the bidding procedure to the extent permitted by law and to award the bid on the basis of the lowest and best bidder as it deems to be the in the best interest of the County of Allen, Ohio. This includes the right to extend the date and time for receipt of bids. Contracts for Work under this Bid will obligate the Contractor to comply with federal, state and local laws, statutes and ordinances, including licensing of Contractors, Federal Davis Bacon Prevailing Wage Rates and non-discriminatory hiring practices. Bidder agrees that the Work will be substantially complete within 540 calendar days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 630 calendar days after the date when the Contract Times commence to run. Contractor shall furnish performance and payment bonds, each in an amount at least equal to the Contract Price MBE (5%), WBE (3%) Substantial Completion is desired within 400 days and Final Completion within 430 days

Award

Water / Sewer

$1,474,700.00

Public - County

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
58
Bidding Soon
1,175
All Active Projects
486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2021

February 16, 2022

img_map_placeholder

6575 Bellefontaine Rd, Lima, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.