BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2022 at 8:00 PM

Updated March 27, 2024

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

As of May 2, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Last day to submit questions: 7 days before due date (3/16/2022) Responses are due no later than 11 a.m. on 3/23/2022 This project consists of the repair of existing concrete structures involving piles driven into the ground for and the installation of a new fender install system. Proposal Security (5% of greatest amount proposed): Required The Response and all required documents shall remain valid for a period of one hundred twenty (120) calendar days after the Response Due Date. The Port Authority reserves the right to reject any or all Responses. Small Business Minimum Requirement is 20%

Post-Bid

Water / Sewer

$840,200.00

Public - City

Site Work

26

23

2

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
376
Active Projects
181
Bidding Soon
3,749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

April 22, 2022

Project location map

To Be Determined, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.