Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Challis, Idaho. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bid Cancelled Dagger Creek Bridge Replacement - This project is for the installation of a government supplied 43-foot prefabricated steel bridge at the Dagger Creek crossing on the 40568 road. Salmon Challis National Forest Magnitude of Construction: Between $100,000 and $250,000 100% Small Business Set Aside NAICS: 237310 Small Business Size: $39.5M Delivery: 60 Days After Notice to Proceed Delivery Location Code: 02L3 SALMON-CHALLIS NATIONAL FOREST 1206 SOUTH CHALLIS STREET SALMON ID 83467 US Period of Performance: 06/15/2022 to 10/15/2022 Install Prefabricated Bridge SCOPE OF CONTRACT This project is for the installation of a government supplied 43-foot prefabricated steel bridge at the Dagger Creek crossing on the 40568 road. The vendor is expected to pick-up a 43-foot government supplied modular bridge from the SalmonChallis National Forest yard in Challis, Idaho, transport to the jobsite and install. The work anticipated includes traffic control, clearing and grubbing, replacement of a 30-inch corrugated metal culvert, removing the existing culvert and installing the bridge, constructing new approaches to the installed bridge on the existing road alignment, and construction of minor channel structures and bank protection. The contractor will be required to supply erosion control materials, fill and aggregate quarried from approved pit locations, and the concrete for the wear surface, as well as any tools, equipment or supplies not listed as government supplied in the contract. Ancillary work includes dewatering and rewatering of the channel, diversion of a live stream, and construction and removal of a temporary bypass road to facilitate traffic during construction. The contractor may use embankment material intended for the approach fills as fill material for the temporary traffic diversion or provide another means of diversion. In-stream work windows for listed species are in effect with in-stream work allowed for a four-week period starting mid-July. Suitable materials sources exist on government property for pit materials near the project. The contractor may use these sources within the constraints of existing pit development/operating plans. The contractor is required to submit plans and documents including but not limited to dewatering, SWPPP, and traffic control plans as well as schedules that comply with project work restrictions. PROJECT LOCATION The project is in Valley County, Idaho, approximately 26 air miles northwest of Stanley Idaho. From Stanley, the site is accessed via Highway 21, and Forest Roads 40579 and 40568. Specifically, commencing at the intersection of ID 75 and ID 21, travel west on ID 21 to approximate MP 109.4 and the junction of FS579. From ID 21 travel west on FS579 to the 579/568 junction, a distance of 9.4 miles. At the 579/568 junction turn onto FS568 and travel north approximately 4.4 miles to the project location. The bridge is located at the Forest Service Yard at the Challis Office (311 HWY 93 N, Challis, ID 83226). The contractor will be responsible for the transport and delivery of the bridge to the job site. MAGNITUDE OF CONSTRUCTION PROJECT In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $100,000 and $250,000. ipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government. D-2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of aw *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Bridges / Tunnels
$250,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 19, 2022
June 15, 2022
Multiple Locations, Challis, ID
Related To This Project
Challis, ID
Bid Date: Jan 17 2023
Challis, ID
Bid Date: Sep 12 2019
Challis, ID
Bid Date: Sep 22 2022
Challis, ID
Bid Date: May 31 2022
Challis, ID
Bid Date: Jun 08 2023
Challis, ID
Bid Date: Sep 16 2022
Challis, ID
Bid Date: May 05 2022
Mountain Home, ID
Bid Date: May 19 2022
Boise, ID
Bid Date: Sep 22 2021
Hailey, ID
--
Boise, ID
Bid Date: May 23 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.