BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Marion, Alabama. Completed plans call for the renovation of a water / sewer project.

Marion Water Treatment Plant Emergency Upgrades: Awarded to: Goldman Contractors Awarded Amount: $218,910.00 Anticipated Start Date: March 7, 2022, but subject to changed As of January 5 the project is set to be awarded in two weeks. The principal items of work are detailed herein below. Principal Work: 1. Valve and Actuator Removal and Replacement 2. Raw Water Meter Replacement 3. Finish Water Meter Replacement 4. Aerator Blower Replacement 5. Misc. Motor and Valve Retrofits The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount, and must secure his bond from a bonding company's representative or agent in the State of Alabama The Supplier is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 60 consecutive calendar days total and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF THE CONTRACT TIME IS EXCEEDED. The Contractor may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving Bids.

Award

Water / Sewer

$218,910.00

Public - City

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
35
Bidding Soon
482
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2021

March 7, 2022

img_map_placeholder

To Be Determined, Marion, AL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.