BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2021 at 7:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Commerce City, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

For Legato West Phase 1 Infrastructure The Legato West Phase 1 improvements shall consist of earthwork, erosion control, storm drainage (including two regional detention facilities (Pond A and B) and Gramma Gulch improvements), water, non-potable water, sanitary sewer, and roadway infrastructure for portions of E. 90th Avenue, E. 95th Avenue, Argonne Street and all construction of Tower Road, Legato Parkway, E. 94th Avenue/Biscay Street, Cathay Court and E. 93rd Place in accordance with Contract Documents including the plans and specifications.

Bid Results

Roads / Highways

$21,194,834.00

Public - State/Provincial

Paving, Site Work

357

4

65

12

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
61
Bidding Soon
1,289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

December 28, 2021

Project location map

Multiple Locations, Commerce City, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.