EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 21, 2021 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Owasso, Oklahoma. Completed plans call for site work for a water / sewer project.

As of December 14, 2021, the project is anticipated to be awarded on December 21, 2021. The scope for this work includes two (2) Projects: Project 1 is a CDBG project complete with federal regulations and Davis Bacon Requirements and Project 2 is a similar project funded with local funds and has to ties to the federal project. Project 1 - This project is the CDBG project provides for furnishing materials and pipe busting the existing 8" sewer line with 8" HDPE pipe as specified, that includes approximately 3,368 L.F. pipe in the Hale Acres subdivision as indicated in the Drawings and Contract Documents. Project includes installing new manholes, services, extending service lines, and reconnecting services. Project also includes plugging the existing sewer line, abandoning manholes, relocating castings and final cleanup. Project has to be bid using Davis-Bacon wage rates (prevailing rates) for the type of work being performed. Payroll submittals will be required along with all the Section 3 paperwork (Under Equal Opportunity Provisions Attachment). Project 2 - This project is a much smaller locally funded project that provides for furnishing materials and pipe busting the existing 8" sewer line with 8" HDPE pipe as specified, that includes approximately 256 L.F. pipe on North Garnett Road, south of Trail's End BBQ as indicated in the Drawings and Contract Documents. Project includes installing new manholes, services, extending service lines, and reconnecting services. Project also includes plugging the existing sewer line, abandoning manholes, relocating castings and final cleanup. No prevailing wages or other federal requirements govern. The two projects have to be constructed independently of each other and funds cannot co-mingle. Project 1 must be constructed and substantially completed before work can begin on Project 2. Bid Results BASE BID "A" TOTAL Horseshoe Construction-$201,005.00 BASE BID "B" TOTAL Horseshoe Construction-$155,451.00

Award

Water / Sewer

$496,102.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
48
Bidding Soon
709
All Active Projects
358
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2021

December 20, 2021

img_map_placeholder

Multiple Locations, Owasso, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Hale Acres CDBG Sewer Line Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.