Site work and paving for a road / highway in Salamanca, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Construction of Phase II of the Quaker Multi-Use Trail which will be an approximately 3.6 mile long, 10-foot wide paved trail extending from the Quaker General Store to the Quaker Lake Beach area. The project includes the construction of eight pedestrian bridges and one elevated timber boardwalk to span existing creeks, swales, and wetlands. The bridges vary in length and will be steel truss structures with timber decks and concrete abutments. Associated work includes storm drainage, erosion control, pavement markings, and signage. Pedestrian accommodations will include roadway crosswalks, advance warning signage, and ADA accessibility in the overall design of the project. The Owner is the OPRHP and the work site is located in the City of Salamanca, Cattaraugus County. The projects limits extend from: Quaker General Store to the Quaker Lake Beach. The project estimate including allowance is: $4,600,000 - $6,200,000. The EEO Employment goals for this project are: 6.3% Minority Employment Goal 6.9% Women Employment Goal RFI's are due by 3:00 PM on November 5, 2021. All RFI's must be submitted in writing in order to be considered. RFI's received after this date and time will not be processed. Questions regarding the Contract Documents should be directed to Carissa Hartson, Contract Administrator, OPRHP through email at Carissa.Hartson@parks.ny.gov. Bidders shall promptly notify Carissa Hartson of any errors, omissions, conflicts or ambiguity within the Contract Documents within 3 days of bid opening. OPRHP reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids. All bids are subject to final review and approval by the Attorney General before any award of contract may be made. Receipt of bids by OPRHP shall not be construed as authority to bind OPRHP. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$4,944,052.00

Public - State/Provincial

Paving, Site Work

83

15

22

9

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Structural Plastics, Structural Plastic Shapes and Plates, Plastic Lumber
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Control Software
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
92
Bidding Soon
1,320
All Active Projects
592
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2021

January 17, 2022

img_map_placeholder

Allegany State Park, Salamanca, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Quaker Multi-Use Trail (Phase II)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.