BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Buckeye, Arizona. Conceptual plans call for site work for a water / sewer project.

Place storm drain pipe and catch basins in Monroe from 4th Street to 9th Street (Storm Drain pipe was placed from 1st to 4th in anticipation of thisproject in 2006). This system will relieve the issue of flooding for the 10 year 2 hour storm for Downtown Buckeye. The waters would be conveyed in a storm drain pipe system under Sixth Street (the piping under the portion closed and adjacent to Buckeye Elementary School is in a separate project) to South Street. At South Street, the pipe system would travel east to Seventh and outfall into a retention basin constructed by this project. As October 25, 2022, this project is currently in the FY 2022-2023 Capital Improvement Plan. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024-2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024-2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$12,600,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
12
Bidding Soon
680
All Active Projects
242
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

Monroe Ave, Buckeye, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.