Site work, paving and new construction of a mixed-use development in Tipton, Iowa. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and sidewalk / parking lot.
Construct 60' x 80' pre-engineered metal building with, concrete floor and foundation, doors, overhead doors, mechanical, electrical and miscellaneous associated work, including cleanup; and construct 30' x 30' metal sided office building with concrete floor and foundation. Sitework consists of excavation, grading, paving, granular surfacing, septic system, reroute and connection of water service, electrical service and other miscellaneous work. All work and materials are to be in accordance with the proposed plans, specifications, form of contract and estimate of cost now on file with the Director of the Solid Waste Transfer Facility and by this reference made a part thereof as though fully set out and incorporated herein. All proposals and bids in connection therewith shall be submitted to the Commission on or before the time herein set for said hearing. All proposals shall be made on official bidding blanks furnished by the Commission, and any alterations in the official form of proposal will entitle the Commission, at its option, to reject the proposal involved from consideration. Each proposal shall be sealed and plainly identified. Each proposal shall be made out on a blank form furnished by the Commission and must be accompanied by bid security, as follows: a certified or cashier's check, drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa in a penal sum of five percent (5%) of the bid By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed non responsive and rejected. The Commission reserves the right to reject any or all bids, to waive informalities or technicalities in any bid and to accept the bid which it deems to be to the best interest of the Commission. The Commission reserves the right to defer acceptance of any bid for a period not to exceed sixty (60) days from the day of letting. The successful bidder will be required to furnish bond in an amount equal to one hundred percent (100%) of the contract price, said bonds to be issued by responsible surety approved by the Commission and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, and shall guarantee the prompt payment for all materials and labor and protect and save harmless the Commission from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of two (2) years after its completion and acceptance by the Commission. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per consecutive calendar day will be assessed for each day that the work remains uncompleted after the specified November 1, 2022 completion date, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor The Commission reserves the right to reject any or all bids, to waive informalities or technicalities in any bid and to accept the bid which it deems to be to the best interest of the Commission. The Commission reserves the right to defer acceptance of any bid for a period not to exceed sixty (60) days from the day of letting. PN 201385
Award
Sidewalks / Parking Lot
$1,780,497.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 16, 2021
December 16, 2021
1202 240th St, Tipton, IA
Related To This Project
Tipton, IA
Bid Date: Feb 24 2022
Tipton, IA
Bid Date: Mar 04 2021
Tipton, IA
Bid Date: Mar 31 2020
Tipton, IA
Bid Date: Jan 19 2022
Tipton, IA
Bid Date: Oct 17 2023
Tipton, IA
Bid Date: Oct 17 2023
Tipton, IA
Bid Date: Dec 20 2023
Tipton, IA
Bid Date: Dec 21 2023
Tipton, IA
Bid Date: Apr 17 2024
Tipton, IA
Bid Date: Apr 04 2023
Tipton, IA
Bid Date: Apr 04 2023
Tipton, IA
Bid Date: Feb 29 2024
Tipton, IA
Bid Date: Feb 21 2023
Tipton, IA
Bid Date: Feb 21 2023
Tipton, IA
Bid Date: Jun 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.