BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Dallas, Texas. Completed plans call for the renovation of a educational facility.

As of 01/03/2022 This project has not been awarded. This project is for the construction of a medium voltage (15 KV) electrical distribution ductbank from V building area on West Campus to existing East Campus ductbank near EC building. Project address: 6011 Harry Hines Blvd, Dallas TX 75235 The project will consist of phase 1 construction of a medium voltage (15 KV) electrical distribution ductbank from UTSW V Locke Building (School of Health Professions) area on West Campus to existing East Campus ductbank near EC building (Harold C. Simmons Radiation Oncology). Ductbank will provide power to East Campus (EB, EC, EF, and BMES [under construction] buildings). Ductbank will be concrete encased and will make use of trenchless construction in areas near or under roadways. Ductbank will include 7 utility manholes/vaults for access. Ductbank will merge with the existing ductbank, constructed for UTSW EC Building at existing manhole EMH2E. . Anticipated project start date: March 1, 2022 . Project duration: 248 Calendar Days ; General Contractor achieves Final Completion November 2022 Question Submission Close Date 11/8/2021 12:00 PM CST General MEP: The existing mechanical, electrical, and plumbing systems throughout the project area (including but not limited to ductwork, diffusers, returns, power, data, and plumbing lines) as well as the building chilled water system and loop will be altered as necessary to accommodate the scope of work. This project must be completed while minimizing disruption to adjacent spaces and equipment which will remain active throughout construction. Utility shutdowns and disruptive work may be required to be completed after normal business hours or on weekends. Any ACM removal required during demolition is to be the responsibility of the contractor.

Post-Bid

Educational

$2,000,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
64
Bidding Soon
3,535
All Active Projects
1,400
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2021

March 1, 2022

img_map_placeholder

6011 Harry Hines Blvd, Dallas, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.