BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2021 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Vicksburg, Michigan. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project consists of furnishing all material and constructing the following: This contractor shall be responsible for all non-electrical removals, relocations, and site preparation, as shown on the plans. The contractor shall then construct underground utilities, conduit, footings, masonry columns and seat walls, gas fireplace, ornamental trellis bar, irrigation, concrete sidewalk, gravel plaza, and site furnishings including all necessary appurtenances, landscaping, and restoration. Electrical work by Oswalt Electric will be done and coordinated with all parties. A bid bond, certified check, or cashier's check payable to Village of Vicksburg in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of forty-five (45) days after the receipt of bids. All work shall be substantially complete by May 20, 2022 and completed and ready for final payment by May 27, 2022. Prevailing wage rates do NOT apply to this project. *Addendum 1 and 2 have been issued.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Paving, Site Work

9

15

9

2

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
105
Bidding Soon
1,535
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2021

December 23, 2021

Project location map

109 N Main St, Vicksburg, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.