BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 19, 2022 at 7:00 PM

Updated November 14, 2023

Site work for a water / sewer project in Andover, Massachusetts. Completed plans call for site work for a water / sewer project.

The work to be done under this contract shall consist of furnishing and installing approximately 775 feet of HDPE drainage pipe, 12 to 24 inches in diameter, complete with manholes, catch basins, water quality control structures, and other related work, to replace the existing drainage infrastructure on Greenwood Road and High Plain Road. The work shall be done in accordance with the Contract Drawings and Specifications prepared by the Andover Department of Public Works. All work is to be completed by December 31, 2021. The construction plans are entitled TOWN OF ANDOVER, MA; DRAINAGE IMPROVEMENTS GREENWOOD ROAD AND HIGH PLAIN ROAD; CONTRACT # 422/016/22; dated July 16, 2021, consisting of two sheets.

Award

Water / Sewer

$168,051.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
594
Active Projects
325
Bidding Soon
4,408
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2021

December 6, 2021

Project location map

High Plain Rd & Greenwood Rd, Andover, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.