BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Suprstitn Mtn, Arizona. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Pinal County Board of Supervisors reserves the right to accept or reject any part of any or all proposals as may be determined in the best interest of the County. End of Q & A period-11/12/2021 @ 5PM Arizona Time INTRODUCTION: The Pinal County Open Space and Trails Department is beginning the development of Peralta Regional Park. This 498 acre park will include passive outdoor recreation activities such as picnicking, primitive camping, night sky viewing and multi-use, non-motorized trail opportunities open to hiking, mountain biking and equestrian use. The multi-use non-motorized trail component will consist of approximately 9.1 miles of natural surface trail opportunities showcasing the Superstition Mountains and the unique park environment. Pinal County is interested in contracting services for a "Project Manager" to facilitate the completion of the following tasks: SCOPE OF WORK: The Contractor shall adhere to the following minimum specifications, performance requirements and all terms and conditions within this contract. 1. Using the center line information provided by Pinal County, mark a sustainable trail corridor for new trail construction. The area in question includes a variety of terrain, with typical Sonoran Desert vegetation. For this project Peralta Regional Park Trails are following Exhibit B - Trails Key Plan. 1.1. Loop Trail (s) - Green 1.2. Connector Trail (s) - Blue 1.3. Backpacking Trail - Purple 2. Trail specifics are: 2.1. Trail bench (full bench)=Minimum 24", maximum 36". 2.2. Scattering and dispersal of excavated materials must be done so as to only minimally alter or impact the landscape. 2.3. Outslope=4%-5% 2.4. Vegetation Clearance, side=5 feet, overhead=10 feet. 2.5. Rock armoring at appropriate drainage crossings. 2.6. Grade reversals and other sustainable trail techniques are required, targeting one for every 50' to 150' of trail. 2.7. All trail structures are to be built with local on-site material. 2.8. There are no anticipated switchbacks needed for this project. 3. All proposals must include details of whether construction is by "hand" or "mechanized" or a combination of the two. Costs for each method must be itemized within the final proposal. 4. On-site review of proposed alignment with Pinal County staff and changes to alignment based on Pinal County staff feedback. 5. Construction of identified trail (use of volunteer labor for some or all of the trail construction is encouraged, but not a requirement) 6. Trail construction may precede park road and amenity development (TH's, parking areas etc), but final connections will need to be coordinated with Pinal County. 7. Post construction on-site visit with Pinal County staff Questions Due Date: Nov 19th 2021, 5:00 PM MST

Award

Sidewalks / Parking Lot

$151,194.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
39
Bidding Soon
994
All Active Projects
423
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 30, 2021

January 3, 2022

img_map_placeholder

To Be Determined, Suprstitn Mtn, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.