BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Atlanta, Georgia. Completed plans call for the construction of a 8,318-square-foot educational facility; and for site work for a educational facility.

Atlanta Technical College Center for Transportation & Logistics College Park, GA . The Georgia State Financing and Investment Commission (GSFIC), as "Owner", on behalf the Technical College System of Georgia ("Using Agency" or "TCSG"), is seeking firms interested in providing general contractor services for a project known as Project No. TCSG-375, Center for Transportation and Logistics for Atlanta technical College, South Fulton, Georgia ("Project") The firms determined by the owner to be the most qualified for this project will be invited to submit bids for the General Contracting Services for this project. New Construction August 14, 2024 2:00 PM Deadline for written questions Project Background: This project includes a 63,000 SF Commercial Truck Driving Training pad that will be a DDS-approved testing site, 48 parking stalls, and a 8,318 SF classroom and shop facility. The building is constructed as a preengineered metal building system and contains (2) classrooms separated with an operable wall, a shop space with CMU construction to house (2) 4 post lifts and a mezzanine area, office spaces, a small conference room, a covered porch observation area, and assorted supporting spaces. This facility will support Atlanta Technical College's Commercial Truck Driving and Diesel Mechanic Training program. The location of this project is at Cochran Road and Cascade Palmetto Highway ( GA Hwy No. 70) South Fulton, GA 30213. Project Delivery Method The delivery method for this Project will be Design-Bid-Build. The owner has employed the services of a Design Professional and a Commissioning Agent. Project Budget The estimated project cost is in the range of $4,000,000. Project Schedule The construction documents are complete and available for distribution to eligible firms in September 2024. Once the construction documents have been issued, contractors will be given a 30-day period to submit a bid. It is anticipated that construction will begin by November 2024. The Owner is targeting the construction duration to reach material completion at approximately 10 to 12 months from the issuance of the proceed . (All of the dates above are estimates which are subject to change.

Post-Bid

Educational

$4,000,000.00

Public - City

New Construction, Site Work

77

35

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
57
Bidding Soon
1,520
All Active Projects
670
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.