BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Carthage, North Carolina. Completed plans call for the renovation of a municipal facility.

SCOPE OF WORK Each person must wear a mask when in the building Contractor is responsible to remove all units and trash from County property. Contractor is responsible for the removal and disposable of all freon. Unit can be a Trane or Carrier. Install a new VFD (if one is not included with unit) All high and low voltage to be reconnected and supported with approved fasteners and fusedproperly Unit currently has Metasys controls that must be removed and then installed back on the newequipment. Duct detector must be removed from and then installed back on the new equipment and willhave to be tested Include a drain pan under the new unit with a float switch installed and tested. Drain line needs to have a cleanout and an access to be able to pour bleach in All soldering of copper lines shall include the use of nitrogen for a clean solider on the inside. Line set must be pressure tested and held for at least one hour. Line set must be evacuated and pumped down to 500 microns and held for the approved time. Filters must be installed in air handler and be easy to change Return box must be installed with an expanded metal for a cap because this is a free flowreturn. All duct work must be properly sealed with approved tape or mastic duct sealant Must include line set length and the amount of freon that was added to the system to be written on the inside the unit and provided with all the documentation in a binder when job iscompleted All permits shall be purchased by the company changing the equipment All aspects to complete this project is the successful vendor's responsibility All written questions shall be sent no later than 10:00 am Tuesday, November 30, 2021 The County of Moore shall reserve the right to reject any and/or all bids Bid Result : Carter HVAC Services - With Economizer - $57,551.00 Without Economizer - $49,838.00

Award

Municipal

$107,389.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
96
Bidding Soon
1,905
All Active Projects
744
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 15, 2021

January 6, 2022

img_map_placeholder

To Be Determined, Carthage, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.