BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2022 at 7:00 PM

Updated November 16, 2023

Renovation of an educational facility in Southport, North Carolina. Completed plans call for the renovation of a 10,870-square-foot educational facility.

For South Brunswick High School Roof Replacement Submit questions to REI Engineers in writing to the email address listed above no later than 5:00 PM on November 4, 2021 Replacement of approximately 10,870 square feet of low-slope roof systems with 2-ply modified bitumen roof system as specified. Site visit to be scheduled with school personnel on a date to be determined at the Pre-Bid Meeting

Award

Educational

$326,636.00

Public - County

Renovation

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
46
Bidding Soon
558
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2021

December 9, 2021

Project location map

280 Cougar Road, Southport, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.