EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 27, 2021 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Dix Hills, New York. Completed plans call for the renovation of a educational facility.

The Architect will respond to the questions in the form of an Addendum. In order to allow time for the distribution of an addendum, the last day for questions shall be Thursday, November 11, 2021. CAPITAL PROJECTS 2018 - 2019 Bonafide prime bidders may obtain complete sets of the Contract Documents upon deposit of 100 for each set payable to CAMPBELL CASSETTA ARCHITECTS PC. Contractors submitting prime bids may obtain a refund of deposit by returning the complete set of documents to the Architect's office, in good, usable condition, within thirty (30) days after receipt of the bids. Any Contractor not bidding shall return the complete set of documents in good, usable condition prior to the bid date in order to receive their bid deposit. Any contractor not bidding who returns the bid package after the bid date shall forfeit their bid deposit. The lowest responsible bidders' checks shall be applied toward the cost of providing working sets of contract documents. Each bid must be accompanied by a Certified Check or Bid Bond made payable to the Board of Education, Half Hollow Hills Central School District in the amount of not less than ten (10%) percent of the amount of bid. This must be deposited by each bidder with his bid as guarantee that in the event the contract is awarded to him, he will, within fifteen (15) days after written notification of such award or intent to award, execute the contract and furnish the performance and payment bonds with a surety satisfactory to the Board of Education. Upon failure to do so, the bidder shall forfeit the deposit (Certified Check or Bid Bond) or an amount equal thereto, as liquidated damages. Acceptance of the bid will be contingent upon the fulfillment of these requirements by the bidder. 8. The Certified Checks or Bid Bonds will be returned when the Board of Education has approved the executed contract or rejected all bids. The successful bidder will be required to furnish a Performance Bond, Labor and Material Payment Bond in the amount of one hundred twenty five (125%) percent of the accepted bids, guaranteeing performance according to Specifications and the Payment of all obligations arising thereunder. The bidder will also be required to show to the Board of Education that he is carrying Workmen's Compensation Insurance as required by law, and all other insurance in an amount not less than specified under Section 00652. 10. The Contract will be awarded to the lowest responsible bidder or the proposal will be rejected within sixty (60) days of the date of the opening of proposals, subject, however, to the discretionary right reserved by the Board of Education to waive any informalities in, or to reject any or all proposals and to advertise for new proposals, if, in its opinion, the best interest of the District will thereby be promoted. All bids will be held firm by the Board of Education for sixty (60) days after formal opening thereof and no bid may be withdrawn within sixty (60) days pending the decision of the Board, except for clerical mistake pursuant to the requirement of General Municipal Law 103. BY ORDER OF: BOARD OF EDUCATION HALF HOLLOW HILLS CENTRAL SCHOOL DISTRICT COUNTY OF SUFFOLK DIX HILLS, NEW YORK

Award

Educational

$1,767,400.00

Public - City

Renovation

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer?s Field Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Wall Coverings, Special Wall Surfacing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction, Operation and Maintenance of Waterway and Marine Construction, Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
295
Bidding Soon
4,783
All Active Projects
2,109
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2021

June 27, 2022

img_map_placeholder

50 Vanderbilt Pkwy, Dix Hills, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

High School East Window Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.