Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 18, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Farmington, Utah. Design plans call for site work for a water / sewer project.

As of July 18, 2022, an engineer has been selected. No firm timeline has been established for the construction. *The previous solicitation is listed below for reference Farmington City is seeking the services of a qualified firm or individual to perform design engineering services for a Well Pump Station. The right is reserved by the City to reject any and all proposals. The method of contractor selection has not been determined at this time.

Design

Water / Sewer

$900,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
63
Bidding Soon
1,238
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

Project location map

To Be Determined, Farmington, UT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed