Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and paving for a bridge / tunnel in Senneville, Quebec. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the demolition of a bridge / tunnel.
Reconstruction of the Highway 40 L'Île-aux-Tourtes bridge connecting the western tip of the Montreal island, spanning the Lake of Two Mountains between Senneville, and Vaudreuil-Dorion. The scope of the project includes the replacement of the existing bridge by a new 2-km long 45-meter wide structure with three lanes in each direction, including a reserved lane for buses, and a bicycle/pedestrian path. The new structure will be built north of the current route and will consist of two separate three-lane decks. Although the new structure is 1.9 kilometers in length, work will have to be carried out over 4.5 kilometers to connect it to Highway 40. During the construction some actions will be carried out to capture, reduce and offset emissions. The owner expects that the new project will be a carbon neutral one. Once the new bridge is completed, the old one will be demolished. TIMELINE: The owner has awarded a consortium Groupe Nouveau Pont Île-aux-Tourtes inc including the firms Dragados Canada, Excavation Roxboro and Construction Demathieu & Bard (CDB) for design, construction and financing in the framework of the reconstruction project of the Île-aux-Tourtes bridge located in the municipalities of Vaudreuil-Dorion, Senneville and Sainte-Anne- de-Bellevue, administrative region of Montérégie and Montreal, provincial electoral division of Vaudreuil and Jacques-Cartier, MRC Vaudreuil - Soulanges. Note: The project value amounts to $2.3 billion, entirely financed by the Government of Quebec. This amount includes the build-design-finance contract, but also professional fees and costs for related activities, such as moving utility equipment.
Award
Bridges / Tunnels
$1,965,279,240.00
Public - State/Provincial
Demolition, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2021
April 13, 2023
Pont de l'Île-aux-Tourtes, Senneville, QC
Related To This Project
Senneville, QC
Bid Date: Jul 24 2023
Senneville, QC
Bid Date: Sep 07 2023
Senneville, QC
--
Senneville, QC
Bid Date: Apr 14 2022
Senneville, QC
--
Senneville, QC
Bid Date: May 15 2023
Senneville, QC
Bid Date: Feb 13 2023
Senneville, QC
--
Senneville, QC
Bid Date: Jan 18 2023
Senneville, QC
Bid Date: Aug 08 2022
Senneville, QC
Bid Date: Apr 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.