BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Waxahachie, Texas. Completed plans call for site work for a water / sewer project.

Questions will only be able to be asked until 12/08/2021 5:00 PM CDT Bid package and must be labeled as follows Marked: Bid-Solicitation, Must include: IFB No. EP-CHAM9-UG-ESF-541-21, Must include the Bid Due Date/Time: December 7, 2021 - 1:00 pm, Must [Show Name and Address of Bidder] The Ellis-Prairie Soil and Water Conservation District (EPSWCD), Waxahachie, Texas is requesting sealed bids from qualified, responsible bidders for UPGRADES to Floodwater Retarding Structure Site 9 at Chambers Creek Watershed in Ellis County, Texas. One award for all items will be made. Performance time is 353 calendar days (not including weather days). Estimated price range is between $3,000,000 and $5,000,000. Major items of work are: 16 AC Clearing and Grubbing; 6,000 LF Sediment Fence; 15 AC Vegetation Establishment; 23,100 CY Excavation; 100 CY Rock Excavation; 1,600 CY Earthfill; 2,300 CY Fine Drainfill; 20 CY Coarse Drainfill; 18,000 SY Embankment Topsoil; 54,900 SY Topsoil; 19,800 CY Lime Treated Earthfill; 950 tons Furnishing and Handling Lime; 80 CY Class 4500 Concrete; 40 CY Class 3000 Concrete; 311 LF Reinforced Concrete Pressure Pipe; 250 LF Perforated Plastic Pipe; 320 LF Solid Plastic Pipe; 40 LF 6" Ductile Iron Pipe; 250 LF Boring and Jacking; 2,200 tons Rock Riprap, R-150; 1,400 tons Rock Riprap; R-300; 700 tons Rock Riprap, Bedding; 250 LF Conduit Slip Lining; 1,956 LF Field Fence; 2,500 SY Geotextile and 1 Job/Lump Sum: Structure Removal; Pollution Control; Irrigation System; Construction Surveys; Mobilization and Demobilization; Removal of Water; Water Control Gate; Metal Work; Identification Plaques or Markers; Contractor Quality Control; Field Office; Conduit Abandonment. [AC: Acres; LF: Linear Feet; CY: Cubic Yards; SY: Square Yards] EPSWCD reserves the right to accept or reject any and all bids. A 5 percent bid guarantee is required. The successful bidder will be required to furnish performance and payment bonds. Estimate: $3,000,000 and $5,000,000

Bid Results

Water / Sewer

$3,696,969.00

Public - County

Site Work

37

20

55

10

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
76
Bidding Soon
3,614
All Active Projects
1,309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

February 14, 2022

img_map_placeholder

To Be Determined, Waxahachie, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.