BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, asbestos abatement and renovation of a mixed-use development in Texico, Illinois. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

**As of November 17, 2021, this project has not yet been awarded. A timeline for award has not yet been established. Work under Abatement Base Bid to include abatement and removal of existing gym floor tile, existing piping and insulation in gym and restrooms, abatement of existing hard ceilings and tile ceilings. Work under Abatement Alternate Bid #1 to include abatement and removal of existing boiler piping and abatement of existing boiler. Work under Abatement Alternate Bid #2 to include abatement and removal of existing upper tile ceilings not covered under base bid. Work under General Base Bid to include demolition of existing thru-window AC units, decommissioning and abandoning in place the existing boiler, existing EPDM roof assemblies, portions of existing wood, gypsum, and steel roof deck, existing gutters, downspouts, fascia metal, existing lay-in and gypsum ceilings throughout the school, existing ceiling mounted light fixtures throughout the school, existing concrete flooring, existing toilets, sinks, toilet partitions, urinals, restroom accessories, interior CMU walls, existing bleacher systems, existing hollow metal door and frames. New work to include new mechanical roof curbs, new packaged heating and cooling units, new water source heat pumps, new DDC controls, new EPDM roof assemblies, new LED light fixtures, new ACT ceilings, new concrete floor, new wood sports floor, new epoxy floor and wall base, new toilets, urinals, sinks, toilet partitions, new restroom accessories, new hollow metal doors, metal stud wall construction, new ceramic wall tile, new bleacher systems, wall painting in the gym, new sports equipment, new safety wall pads, new acoustical wall panels, new gas lines, and painting of the gas line and gypsum ceilings. Corresponding structural, mechanical, electrical, and plumbing work will be included. Work under General Alternate Bid #1 to include the removal of boiler and boiler pump in their entirety as defined in the Construction Documents including all required associated mechanical and electrical work. Work under General Alternate Bid #2 to include the provision of new 90 mil., 30 year warranty roof assembly in place of the 60 mil., 20 year assembly called for under the base bid, as defined in the Construction Documents including all required associated mechanical and electrical work, Work under General Alternate Bid #3 to ir elude the provision of a new sound system in the gymnasium as defined in the Construction Documents including all required associated mechanical and electrical work. Work under General Alternate Bid #4 to include the provision of a new concession storage room, including new interior CMU walls, new wall opening and header, new coiling serving counter door and counter, and wall painting as defined in the Construction Documents including all required associated mechanical and electrical work. Questions to be directed to Architectural: Baysinger Architects, LLC Matthew Maloney matthew@baysinger architects.com 401 North Market St. Marion, IL 62959 Ph. 618.993.8250; Fax 618.993.8255 LOCATIONS: Field Community Consolidated School District #3 21075 North Hails Lane, Texieo, Jefferson County, Illinois 62889

Award

Educational

$2,663,000.00

Public - State/Provincial

Asbestos Abatement, Renovation, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Decking, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Steep Slope Roofing, Roof Tiles, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Storm Drainage, Roof Drains, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Turning Vanes, Flexible Ducts, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Trenching and Backfilling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
23
Bidding Soon
426
All Active Projects
171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2021

April 1, 2022

img_map_placeholder

21075 N Hails Ln, Texico, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Field Elementary School Health Life Safety Renovations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.