Published February 3, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Evansville, Indiana. Completed plans call for site work for a water / sewer project.

All bids were rejected, as of now unsure if they will rebid or not waiting on confirmation. The work for which bids are to be received consists of: The work for which bids will be received includes the manned-entry rehabilitation of approximately 1,266 linear feet of 72- inch reinforced concrete pipe. The manned-entry rehabilitation work will include both urethane and epoxy grout injection through the pipe wall into the surrounding pipe bedding, as well as troweled on epoxy mastic for sealing pipe joints within the pipe. Additionally, the work includes stabilization of soils above the rehabilitated pipe and beneath existing roadways through the use of polyurethane grouting. The work will also require bypass pumping of combined sewer flows on an asneeded basis, as well as traffic control. Work shall also include all supervision, equipment, traffic control and all appurtenances necessary to complete the work shown in the Drawings and Specifications. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications. The above referenced project description includes items that are part of the Itemized Base Bid. The Contractor shall be responsible for all work shown on the plans and described in the specifications pertaining to the Itemized Base Bid, regardless of the installation method chosen. The Evansville Water and Sewer Utility further reserves the right to waive informalities, and to award the contract to the lowest and most responsible bidder (or bidders), all to the advantage of the Evansville Water and Sewer Utility, or to reject all Proposals. The Work will be substantially completed within 120 from the date when the Contract Time commences to run. The Work shall be completed and ready for final payment within 150 from the date when the Contract Time commences to run. Final Completion: 180 consecutive Calendar Days

Award

Water / Sewer

$1,096,535.00

Public - City

Site Work

5

14

4

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
38
Bidding Soon
646
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2022

February 17, 2022

Project location map

E Franklin St, Evansville, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.