BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Hereford, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of 112/10/2021 Project has been awarded but award information is currently not available. The Hereford ISD reserves the right to reject any or all proposals and to waive all formalities. Work of this project includes all items shown and/or described in the bid documents for resurfacing and expanding parking lots at HISD Administration, and Bluebonnet. Work also includes concrete work at the Field House. B. Work at the Administration building may begin immediately. Building users will be parking at an alternative location and contractor will have full access to the parking lot. The desired outcome is that the Administration building be complete prior to November 22, 2021 and is the highest priority for completion this year. C. Work at Bluebonnet must be coordinated with the schedule of the teachers and staff if it can be done prior to school end. Only one parking lot may be worked on at a time to allow users access to one parking lot. D. Concrete work at the Field House is to be performed after separate work to football field is completed. The anticipated schedule for this work will be a timeframe after March 1, 2022 and before June 30, 2022. This schedule is to be coordinated with the district.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
6
Bidding Soon
107
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2021

March 1, 2022

img_map_placeholder

Multiple Locations, Hereford, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.