BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Saint Marys, Ohio. Completed plans call for site work for a water / sewer project.

As of October 6, 2023, a contractor has been selected. Construction anticipated to begin soon and be completed by May 2024. A detailed scope has not yet been released. *The closed solicitation has been included below for reference: Statements received after this deadline will not be considered. Statements of Qualifications should include information regarding: the firm's history, education and experience of owners and key technical personnel, technical expertise of the firm's current staff, the firm's experience in designing similar projects, availability of staff, the firm's equipment and facilities, references, and any previous work performed for the City of St. Marys. Following this evaluation, the City of St. Marys will enter into contract negotiations with the most highly qualified firm. The preliminary project description is as follows: NAME OF PROJECT: City of St. Marys Miami-Erie Canal Treatment Train Project LOCATION: The treatment train will be located east of Aqueduct Road and south of Greenville Road in St. Marys Township, Auglaize Co. Ohio on approximately 65 acres of existing farm ground. The project consist of the construction of a treatment train/wetland system to treat canal water that flows through the City of St. Marys. The project is an ODNR funded project through the H2Ohio Grant, approved by ODNR for construction. The engineering consultant will be required to provide all necessary engineering/consultant services such as flow studies, geographic studies, surveying, environmental studies, right-of-way, wetland/treatment train design, reports, approvals, all necessary permits and construction oversite as required. TOTAL PROJECT BUDGET: Including studies, engineering, permitting and construction, $3,500,000. All engineering/consultant will be funded by the H2Ohio grant. Anticipated dates for design startup/bid award - November 2021/April 2022. Anticipated date for construction - May 2022.

Award

Water / Sewer

$3,500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
74
Bidding Soon
1,050
All Active Projects
475
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2023

img_map_placeholder

To Be Determined, Saint Marys, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.