BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lynn, Massachusetts. Completed plans call for site work for a water / sewer project.

Phase 3 West Lynn Sewer Separation Construction Project - Sub The Filed Sub-Bid categories include: Electrical Work, Heating Ventilation and Air Conditioning (HVAC), Masonry Work, Miscellaneous and Ornamental Iron, Painting, Plumbing, Roofing and Flashing, Waterproofing, Damp-proofing and Caulking. The project delivery method for construction is design-bid-build. The Project includes construction of the new 96 mgd storm water pumping station, electrical building and force main tunnel that will be located at Neptune Park along Commercial Street near the intersection of Bennett Street, bounded by the MBTA rail line to the south, Commercial Street to the west, an apartment complex to the north and public park to the east. The force main portion of the project is in Commercial Street from the intersection of Commercial and Bennet Streets at the beginning and ends to the south approximately 1,000 feet on Commercial Street to approximately 280 feet south the intersection with the Lynnway. Select drawings and specifications included for reference. Drawings and specifications included are not for construction purposes. Work on the project will commence in the Winter 2022 and Anticipated Notice To Proceed: January 10, 2022 ; construction will be completed in 900 Days . Removal and legal disposal of five suspected underground fuel oil storage tanks. Excavation of 3 metallic anomalies along the south project boundary and legal disposal of the same. . Removal and disposal of the top eight feet of soil from the site. . Cap existing utilities in the area of the pumping station and the electrical building. Remove and legally dispose of the existing piping between the caped sections. . Removal and legal disposal of light towers. . Reconstruction of athletic field adjacent to the site. . Roadway restoration including asphalt paving, concrete sidewalk and curbing. . Other work including, but not limited to: temporary facilities and environmental controls; geotechnical instrumentation and monitoring; dewatering; temporary flow bypassing; maintenance of traffic; and general site work Estimated Construction Cost: $38,000,000 4.20 percent D/MBE participation and 4.50 percent D/WBE participation General Bids for construction of the Phase 3 WLSS Project. In order to be eligible to submit a general bid for this Phase a general bidder must be pre-qualified by the LWSC.

Post-Bid

Water / Sewer

$38,000,000.00

Public - City

Site Work

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
117
Bidding Soon
2,217
All Active Projects
851
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

February 16, 2022

img_map_placeholder

Multiple Locations, Lynn, MA


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.