Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Cincinnati, Ohio. Working plans call for the renovation of a educational facility.
Project Purpose and Rationale: This project will add chilled water capacity to address additional chilled water loads that are projected to be added to the ECUP in 2022, 2023 and 2025. This project will add 6,000 tons of chilled water capacity to the ECUP. Additional chilled water capacity must be added to ECUP by no later than April of 2023 to support the additional load projected in summer 2023. Chillers: The new 6,000 tons of chillers are planned to be located in the 1st floor of the plant where (2) boilers were previously located and where a work shop area is located currently. (1) boiler has already been demolished and the 2nd boiler is currently in the process of being demolished. An RFP for the new chillers has been advertised by the UC utility group; the purchase of those chillers will be funded by this project and is included in the advertised cost of work below in this RFQ. The chillers have not been selected at this time. The CMR shall assist with selectin, receive and install the chillers. The CMR shall provide spatial coordination and logistical coordination for the new chillers. New chilled water pumps will be required to support the new chillers. Cooling Towers: This project will add cooling towers on the roof of the structure to support the new chillers. The towers are desired to be located on the roof where existing coal pollution control equipment is located today. A future long term plan will install towers located on an addition that will occur on the North West corner of the plant adjacent to existing aged towers CT-1, 2 and 3 in order to replace said towers. The available space for an addition is limited to 2 levels at ~ 2,500 sf each at this North West location. This plant addition is part of this project. The plant addition will house a shop / work area for the plant operators as well as potentially housing electric gear. The cooling tower purchase and installation will be part of this project and not a direct purchase by the owner. New condenser water pumps will be required to support the new towers and chillers. The selected Construction Manager at Risk ("CM"), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner's project requirements and refine the project schedule. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Submit all questions regarding this RFQ in writing to Mike Myres at michael.myres@uc.edu with the project number included in the subject line (no phone calls please). Questions will be answered and posted to Opportunities page on the OFCC website at https://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document Total Project Cost: $23,000,000 EDGE Participation Goal- 5%
Final Planning
Educational
$23,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 4, 2022
July 1, 2022
3220 Eden Ave, Cincinnati, OH
Related To This Project
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Jan 13 2022
Cincinnati, OH
--
Cincinnati, OH
Bid Date: May 23 2024
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Feb 15 2022
Cincinnati, OH
Bid Date: Mar 15 2021
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Feb 22 2022
Cincinnati, OH
Bid Date: Jan 28 2022
Cincinnati, OH
Bid Date: Feb 23 2022
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Jan 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.